Ausfilm Member since 2003
Docklands’ new 3,700 sq m (40,000 sq ft) super stage with water pit is one of the largest in the southern hemisphere.
This new facility – Stage 6 – complements our five other stages ranging from 743 sq m (8,000 sq ft) to 2,323 sq m (25,000 sq feet).
We have two LED volumes – one measuring 12 m tall x 88 m wide (40 ft x 289 ft) in Stage 1, the other measuring 8 m wide x 21 m wide (26 ft x 68 ft) in Stage 3. Both are operated by NantStudios.
We are proud to be the first major film studio in Australia powered entirely by renewable electricity.
We’ve made the switch to leading government–accredited GreenPower to support the global screen industry’s push to reduce its environmental impact.
All our six sounds stages, production offices, mess halls, workshops make-up rooms and administration buildings are powered by 100% renewable energy sources such as solar, wind, hydro and biofuel.
The studio lot is secure with plenty of parking.
Docklands Studios is a dry-hire facility, allowing productions to select from Victoria’s large pool of world-class service providers, including lighting, camera, drone, equipment hire, editing, VFX and post.